Jo came up with an idea to stop the ingress of rain into the railway room. The problem has been that the original side sheets are inside of the steel hull, and clamped to it with a strip of oak. When built it was sealed along the full length on both sides with sealant. However it would appear that although we have resealed it, rain still gets through.
Jo’s idea was to purchase some additional sheeting, the length of the hold, and 50cm wide and to attach it along its top edge to the strings holding the side sheets, and letting this new sheeting to hang over on the outside of the steel. I though this was a brilliant idea. Jo ordered the sheeting yesterday afternoon. It arrived 8:00am this morning!
I had to an appointment with Physiotherapy at Warwick Hospital this morning, so when we got back, we had a sandwich for lunch, and set about cutting and fitting this new sheeting on the starboard side. Once finished had to turn Hadar around to be able to do the port side. Once finished we turned Hadar again.
After all this I was able to do a little bit more on the layout. I have glued in place the last section of road surface over the canal bridge which completes the road from the farm to the canal bridge.
I have also glued down the 1st section of road surface across the canal and railway bridges at the village.
I have also finished the 2 front strings on the model of Hadar, and progressed further with the sheeting strings.
Keith.