Disaster day today! I thought I would have a rest day from building stuff for the layout, and run some trains.
I had to fit the 2 removable bridges.
For whatever reason the larger bridge would not fit in properly and in the attempt to do so I damaged the end piece of track on the layout!!!!!!
After the blue air subsided and I sat down and thought about it, I managed to remove the broken piece of track.
I had to unsolder the 2 rail joints with the next section of track.
Then I was able to slide the rails out.
Unfortunately too many of the chairs which hold the rails to the sleepers were damaged, they are very small, so I have had to remove the piece of track completely.
I spent 2 hours sanding the 2 ends of the bridge with a sanding mouse.
Now it fits again.
I have ordered replacement track which will take a while to arrive under the present circumstances.
Keith