Saturday, 17 February 2018

Farm Tunnel Part 2

Further work on the farm tunnel today.
The tunnel portal and track in place leading to the lift off bridge.


Close up showing the 2 screws below the track and soldered to it, to guarantee the track doesn't move as it has to align with the track on the lift off bridge.



The tunnel track glued in place.


The tunnel cover which will be the baseboard for the farm.


Keith.

No comments:

Post a Comment