Saturday, 17 March 2018

More Bridge Construction

Road base now in place which will need surfacing with sanding belt sand paper.
Also in place the two connecting stone walls which join the two bridges together.



This afternoon I finished off the end of the road and bridge.




I have used Peco 'N' gauge bridges and although the bridge over the canal is okay, the one over the rail track needed raising up about 8mm to clear rolling stock.


The side walls for this bridge also needed raising up too.


I also did this to the tunnel portal I fitted a couple of weeks ago.


I will have to do the same to the tunnel portal at the other end of the tunnel.


Keith.

No comments:

Post a Comment