Wednesday, 29 August 2018

Primering and Final Landscaping.

Shopping this morning meant a delayed start today. I have though primered with red oxide the canal lock approach walls and the lock landing.

IMG_0259

I have fixed the towpath under the bridge and the towpath ramp, and primered both and the remaining retaining walls around both bridges.

IMG_0260

The other end of the towpath under the bridge.

IMG_0261

I have prepared the lock beam tread areas for attaching the raised bricks which I have cut ready.

IMG_0265

Finally I have prepared the last pieces of landscaping, I will glue them down tomorrow.

IMG_0266

IMG_0267

Keith.