Thursday, 6 September 2018

Base Coat Painting

With the majority of plaster landscaping having dried by this afternoon I was able to complete this section of the base coat of painting.

The canal bridge and earth bank on the towpath side and the towpath.

IMG_0307

the lock landing below the lock.

IMG_0308

The lock side. Some finer finishing off is required with a finer brush than the ½” brush I used to get the coverage required.

IMG_0312

Churchyard, towpath, canal bank and railway embankment.

IMG_0309

The 2 hills at the end of the layout.

IMG_0310

Full length view of the canal lock and village area.

IMG_0311

Keith.

No comments:

Post a Comment