Sunday, 16 September 2018

Final Plaster Work.

With the 2 bridges fixed in place yesterday, I was able this morning to complete the landscaping up to them.

The canal lock side.

IMG_0363b

The towpath side below the canal bridge.

IMG_0365b

Keith.

No comments:

Post a Comment