Saturday, 1 September 2018

Foundations and Lock Area

This morning I fixed the foundations of Jo’s Tea Room, the lock cottage and stores in place.

IMG_0278

After lunch and when the glue on the foundations had set, I did the final plaster work around the lock.

IMG_0279

Also the plastering along the top edge of the lock landing.

IMG_0280

Keith.

No comments:

Post a Comment