Wednesday, 28 November 2018

The Start of Ballasting

This afternoon, after making all the preparations, like vacuuming the layout, I have started ballasting the track.
It is going to take a while, and I thought ballasting O gauge track was bad enough!
IMG_0769

I am using the end of a teaspoon to drop a small quantity of ballast between, and either side of the track.
IMG_0771

I then use a small paint brush to level the ballast, remove it from on top of the sleepers and to sweep it up along the edges.
IMG_0772
Keith.

No comments:

Post a Comment