Tuesday, 27 November 2018

Canal Wharf, Engine Shed & Buffer Stop.

The last few pieces ready for the track ballasting.
The brickwork between the canal wharf wall and the siding track, installed and painted.
IMG_0763

The inspection pit and flooring inside the engine shed painted.
IMG_0764

IMG_0766

The start of a scratch built buffer stop.
IMG_0762
Keith.

No comments:

Post a Comment