Sunday, 6 November 2022

Success!

 Success! 😁 Trains that go round without derailing at the large lift-out bridge. My 1st opportunity to run the Bachmann double Fairlie and rather impressed with it's pulling power hauling 5 Peco L&B coaches up the 1 in 60 gradient through the station and past the canal lock (express speed through the fiddleyard with the down gradient). I still initially had one of the coaches derailing at the bridge joint to the fiddleyard, but I swapped a few bogies around and oiled the axle bearings. At long last I can sit in my armchair in the middle and watch trains go round and round all day long 😊


Keith

1 comment:

  1. And to prove it, you did (watch the train go round and round)!
    Well done.

    ReplyDelete