This morning the new set of alignment dowels arrived so I glued them in. I also drilled the holes for the bolts and wingnuts joining the 3 baseboards together
As I have to wait for the glue to set overnight the only other thing I could do in preparation was to number the legs are their locations in the 2 outer baseboards ready for drilling tomorrow.
 |
| 1st leg numbered |
 |
| Matching number on baseboard |
 |
| 8th and final leg numbered |
 |
| Matching number on baseboard |
 |
| Post Office doors 3rd coat of gloss red and 1st coat of red to the Post Office signs and post-box |
Keith
No comments:
Post a Comment