This morning I added the first floor wooden floors. This is the last major part of the construction, with just detailing to do, like gutters, down pipes and ridge tiles externally, then some minor detailing the insides. Last time when I constructed the joint cottages and post office for the old Hadarford, I left doing the downpipes until after painting, but I won't this time, I will glue them on before painting. 😊
Keith

No comments:
Post a Comment