Monday, 10 November 2025

New loco Completed and Door Painting

 With it being damp outside not ideal to do spraying of the terrace or sawing the baseboard legs to length,  so indoor jobs today. I started by marking the legs to the same length ready for sawing.

I reassembled the new loco and added some clear and red jewels to the lights.



Then I added the number 4 transfers to each side, this now completes this loco.



An 'indoor' job of painting 'doors' for the terrace.


Keith

No comments:

Post a Comment