Tuesday, 14 December 2021

Point Rodding Part 1

 I initially bought one kit of point rodding to see how far it would go and work out how much more I needed. 

Point rodding is a mechanical way of operating points and signals from a signal box. 

From my workings out I needed a further kit and the extension set which arrived yesterday. 

Yesterday and today I have been planning out the runs for the 2 points, 2 ground signals and 2 facing point locks, at the canal wharf end. Facing point locks are necessary where train approach a facing point as rodding operating the blades of a point is insufficient to hold them in place with approaching trains, the locks lock the blades in place. 

This could take a while.

The full run.


1st point and point locking.


2nd point, point locking and 2 ground signals.

Keith

No comments:

Post a Comment