Saturday, 18 December 2021

Point Rodding Part 2

 Today I started assembling sections of point rodding.

This 1st section is made up from 6 pieces glued together with 3 droppers added to the end.


Closeup of the 3 droppers which drop the rodding underneath the level crossing.


The next 3 sections 2+1.


This is the junction that goes between the 2 sections assembled so far, it allows a change in direction of the rodding, it is made up from 3 based glued together and 3 angles glued on top of the bases.

Keith

No comments:

Post a Comment