From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.

Please feel free to leave comments, I am always interested in suggestions or questions.

Wednesday, 8 January 2020

Christmas Presents


Today I finished making and painting the bicycle shed and bikes kit that Jo bought me for Christmas.



She also bought me a baler for the farm.



Today I added some flowerpots and tubs to the front of the vicarage.


One behind the pub.


Some at Hadarford Lodge.


And some on the canalside of the canalside cottages.

Keith.

Tuesday, 7 January 2020

New Coaches

Today a pair of 4 wheel coaches arrived in the post. 
I have painted the roofs and ends of the coaches, and applied the transfers. 
I then added them to the original set of 5, which as it had a brake coach at each end which do not have any passenger carrying capability this meant there were only 3 passenger carrying coaches in the set. 
I am leaving them in their "Indian Red" livery, just to give a mix of colour in the set. It is reminiscent of when British Railways was changing from crimson/cream livery to maroon and for quite a long time trains ran with mixed liveries, whilst they were gradually repainted.


Keith.

Friday, 3 January 2020

Westland Sea King Helicopter Part 7

Back to building the Westland Sea King helicopter today. 
Adding the port side hull to the starboard side and deck.




Added the base.


Added the engine cover and air intakes.


Added the nose.

Keith.

Sunday, 29 December 2019

Westland Sea King Helicopter Part 6

Helicopter interior fixed to starboard hull.


Extra trainee crew member added.


Keith.

Westland Sea King Helicopter Part 5

Crew painting finished and fixed in place.
Pilot and co-pilot.


Radio/radar operator.


Winchman and trainee.

Keith.

Saturday, 28 December 2019

Westland Sea King Helicopter Part 4

This morning the crew for the Westland Sea King helicopter arrived in the post, since then I have been painting them.

Keith

Tuesday, 24 December 2019

Westland Sea King Helicopter Part 3

Some further slow progress with the helicopter today, detail added to the base.


Wheels and inside of floats painted and fixed to both sides.




Winch painted and attached to side.

Keith.

Monday, 23 December 2019

Westland Sea King Helicopter Part 2

Not much done on the helicopter today, small fiddly painting takes its time, especially the stretcher.





Keith.

Holiday Roadworks

Holiday roadworks. 😞



But at least someone is getting fibre broadband for Christmas😊

Keith.

Sunday, 22 December 2019

Westland Sea King Helicopter

My Christmas project, building a Westland Sea King Helicopter. 

Interior detail, including extra detail I downloaded, printed out and glued in place, 
such as the safety harnesses on some of the seats, those that will be seen, each one individually cut out and glued in place.



Radio/radar room.


Cockpit.



The seats with added safety harnesses.

Keith.

Log Pile Part 5

Completed log pile.

Keith.

Saturday, 21 December 2019

Log Pile Part 4

Jo took some photos of me adding more logs to the cottage log pile.



Another row added this afternoon, getting there.

Keith.

Log Pile Part 3

Another row of logs added this morning.

Keith.

Friday, 20 December 2019

Log Pile Part 2

A few more logs added this afternoon.

Keith.

Log Pile Part 1

This log pile is going to take a long time, 1st row of logs glued in place.
I need to wait for this row to set before attaching the next row.


Keith.

Thursday, 19 December 2019

Log Pile

This cottage has a built-in log store alongside it.


So this afternoon I have been cutting twigs to create a log pile for the cottage.

Keith.