From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. The last layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

I have now built the layout. This is now a full record of the building of this layout and any new additions along the way.

Please feel free to leave comments, I am always interested in suggestions or questions.

Sunday 14 May 2017

Station Hotel 7

Today I decided to add an extra chimney at the rear of the hotel, which will be for the kitchen.

SAM_8080

SAM_8079

At the same time I constructed the central chimney, then I added to the roof, which I completed today. I then added the barge boards and most of the guttering (see further down for explanation).

SAM_8078

The completed roof fitted temporarily to the building. I am leaving it loose for the time being so I can install the led lighting when it arrives next week.

SAM_8076

SAM_8075

I haven’t added the piece of guttering on the rear wall as this will have to be done once the roof is fixed on to the walls. This piece of guttering will have to cross the small chimney, which will make the roof unable to be removed once this has been added.

SAM_8077

Keith.

No comments:

Post a Comment