Preparing the sheets of stone walling for the row of terraced cottages and shops. On each end and each side of each sheet there are 3 production 'pips', 12 on each sheet, which I have removed on all 9 sheets of walling. Just the 8 sheets of roofing tiles and 2 sheets of wood flooring to do!
![]() |
| A single sheet of stone walling |
![]() |
| 3 production pips on one end of one sheet |
![]() |
| All production pips removed on one sheet |
![]() |
| 9 stone walling sheets completed |
![]() |
| Just 8 roofing tiles and 2 wooden flooring sheets to go |
Keith





No comments:
Post a Comment