From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.
I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.
For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.
I had thought about building a layout in our garden alongside our mooring at the
This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.
Please feel free to leave comments, I am always interested in suggestions or questions.
Sunday, 21 March 2021
Wednesday, 17 March 2021
Tuesday, 16 March 2021
Saturday, 13 March 2021
New Fire Engine
The local fire brigade are out trialling their new pump ladder engine, the centre one of the three, which arrived yesterday. 🚒
Keith
Lift-out Bridge Repairs Part 7
Yesterday some shiny new chain arrived in the post.
This morning I replaced the temporary rusty length I had used to test the theory on the short lift-bridge.
These 2 photos show how the chain and tensioner takes up the variable gap, due to expansion and contraction of the hull dependant on outside temperature, between the bridge and the layout.
I then fitted the remaining length of new chain and a new tensioner below the long lift-out bridge.
It still needs some adjustment on another day.
Keith
Friday, 12 March 2021
Lift-out Bridge Repairs Part 6
Not a lot different from yesterdays photo, but this morning I applied the glue to the ballast, and as Eric Morecombe would say "you can't even see the join!" 😲
Well you can ever so slightly where the wet ballast meets the old dry ballast 😊
Keith
Thursday, 11 March 2021
Lift-out Bridge Repairs Part 4
This afternoon I resoldered all 4 rails to their respective locating screws.
The 2 large screwheads are part of the rebuild, the plywood baseboard was lifting due to not enough screws holding it down to the timber frame.
Keith
Lift-out Bridge Repairs Part 3
Busy morning with Jo's mouse sander making the larger lift-out bridge easier to fit in place.
When I first built the 2 bridges it was during the summer, during the winter the steel hull shrinks and they were more that a tight fit.
I had cured the smaller bridge before my back went last year.
Now the larger one has room to spare which I have a plan to cure, which I have successfully used on the smaller bridge and works well.
Once I finished sanding I glued the new section of sleepers in place with Evo-Stik, fitted the rails to align the sleepers correctly.
Keith
Wednesday, 10 March 2021
Lift-out Bridge Repairs Part 2
All the old ballast and glue removed from the lift-out bridge.
New sleepers temporarily fitted to ensure enough of the old ballast has been removed.
Keith
Lift-out Bridge Repairs
Just over 8 months ago (June 30th to be precise) I was working on repairing the long lift-out bridge on Hadarford, when I had a prolapsed disc which over the ensuing months turned into Facet Joint Arthritis.
With a lot of patience, working with the local Physio, and exercise, today I finally got to make a start on the repair work, along with a "little" assistance from the PW staff.
Rails and broken sleepers removed.
Keith
Small Mixed Freight
Small mixed freight disturbs a badger near the old pillbox on the end of Hadarford wood by Hadarford lock.
Keith
Tuesday, 9 March 2021
D031 on the Morning up Passenger Service
D031 on the morning up passenger service passing through the PW depot and underneath the castle ruins.
Keith
Monday, 8 March 2021
Sunday, 7 March 2021
British Railways Day
"British Railways Day" at Hadarford today, some of the volunteers have brought a few of their lovingly restored BR road vehicles out to display for the day, whilst D471 is in the station on the up morning passenger service.
Keith
Saturday, 6 March 2021
An Experiment in Lighting
The guttering above Hadarford creates a shadow for photography from the existing lighting, and I have been Photoshopping every photo to remove the shadow.
This afternoon I fixed a 5 metre strip of led's underneath the guttering.
I think I need to tone them down, I have a few ideas on that.
Keith
Early Morning Gunpowder Shipment
For those not au fait with railway transporting practices, the 2 empty flat wagons are intentionally fitted either side of the gunpowder wagon, just in case of 💣💥😲
Friday, 5 March 2021
Thursday, 4 March 2021
D661 on Bugbox Up Service
D661 on the bugbox up service approaching Hadarford station from Hadarford tunnel, whilst D201 takes on diesel in the maintenance yard.
Some grey clouds looming behind Hadarford farm.
Keith
Wednesday, 3 March 2021
Camping
The Beeton children Janet & John are camping in Beeton woods behind their parents cottage.
Sylvia Turner is about to join them having walked from her parent's home Hadarford Lodge.
Keith
Monday, 1 March 2021
A1 Models Boxcab Loco Part 9
This morning I fixed the completed engine to the Kato chassis.
The photos do not pick it out well when the body is on, but you can see it rather than an empty space.
Having completed D01 it is brought into service on the up passenger/mail service passing Hadarford lock.
Keith

















































