From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.

Please feel free to leave comments, I am always interested in suggestions or questions.

Tuesday, 11 August 2026

Station Masters House Driveway and Start of Point Rodding

 This morning I created the garden borders in front of the station masters house using the strips of bricks I cut the other day. 😊

This afternoon I glued down the driveway surface in front of the station masters house.


Then I made a start on laying the point rodding. 😊

First piece of point rodding fixed in place and under track tube for the next section fixed in place.

2nd piece of under track tube on the far side of the track.

Point rodding now completed on this baseboard

 Keith

Monday, 10 August 2026

Small Tasks Day

 Today I have started to tackle a number of small tasks now the major building work is completed on the first baseboard.

First I sprayed with primer the walkway which will go in front of the signal box so staff can cross safely over the point rodding

On my old layout I cut strips of bricks to create borders between the flowerbeds and pathways/drives/lawns

So I have cut similar strips of bricks ready to create borders for the large house

I haven't been happy with the joint of the 2 halves of half-relief banks I joined together

I have cut a piece of emery cloth to fit over the roof

I then glued it down with Evo Stik using a handy weight to keep it pressed down

I joined to half downpipes together and sprayed them with primer

Once the glue had set on the roof I used Polyfilla to fill the gaps in the low parapet

After an hour I painted the downpipe gloss black

I painted the walkway brown

I rubbed the PolyFilla down on the bank roof and painted the low parapet grey
I fitted the downpipe I made and painted earlier, it's main objective was to hide the join between the 2 parts of the bank, the join at the other end of the bank is hidden by a chimney.

Walkway weathered and glued in front of the signal box

Roof of the bank weathered as recommended by some fellow modellers

Keith

Saturday, 8 August 2026

The Railway Inn Part 28

 Guttering down pipes and waste pipes all attached this morning, which now completes the build of the Railway Inn. Bending the 1mm dia. plastic to fit the overhanging fancy tiles was interesting, I took my time as I didn't want to snap any of them. I have done some touching up of the paintwork now all the handling is over. It is now glued onto the layout 👍. 

First and most awkward downpipe fitted

2nd downpipe fitted

3rd downpipe fitted

Waste pipes and hopper fitted

All pipework to the rear of the Inn completed

4th downpipe fitted

5th and final downpipe fitted

The front is now also completed

Glued onto the layout using a hand weight to keep it pressed down

Viewed from the other side

Only taken 6 weeks to complete, but what an interesting 6 weeks 😁

Having completed the Railway Inn and glued it in place this morning, this afternoon I glued a section of spear point fencing and a section of stone wall and an access gate behind the Inn. The gate is to give railway staff access to the 2 points and control equipment from the signal box. 😊

Stone wall and spear point fencing behind the Station Inn

The gate giving access for railway staff to the points

Keith

Friday, 7 August 2026

The Railway Inn Part 27

 It's a 'sign' of the times, I created 4 signs and attached them to the Inn.

Paper signs cut out ready

2 parts of the hanging sign glued together

One sign glued to one side

The other sign glued to the other side

The 3 name signs glued to a piece of plastic sheet

First 2 border sides to the larger sign glued to the plastic sheet

Remaining 4 side borders to the smaller signs glued to the plastic sheet

The top and bottom borders glued to the plastic sheet

Borders trimmed and the 3 name signs cut from the plastic sheet and the hanging sign

The large name sign glued to the front of the Inn

One small name sign glued to one side of the Inn

The other small name sign glued to the other side of the Inn

The hanging sign glued to the front of the Inn

Downpipes, waste pipes and waste pipe hopper sprayed with primer

The downpipes painted with gloss black and ready for fitting, I have left the hopper attached to the blacktac so I don't lose it

Keith

Thursday, 6 August 2026

The Railway Inn Part 26

 This mornings grueling task! Spraying the Railway Inn roof with primer.



It is grey primer, but for some reason it looks white

Now it is matt white


This afternoon I painted the roof and chimney pots red, the chimney cap grey, gutters black and the bargeboards gloss white

Rear of the Inn

One end

Tother end

Front of the Inn

Sited in its location on the layout

The view visitors will see.

This evening I glued the roof onto the Railway Inn.

Testing the roof is firmly attached to the building

Also from the other side

Signal box and a section of stone wall up to it both glued in place

final section of stone walling glued alongside the signal box and final section of boundary fence and pedestrian gate for the large house glued in place

Keith