The boat crew and accessories ready for painting.
Yesterday Jo pointed out to me that I hadn’t put the blue surround around the edges of the slides, now rectified.
Keith.
From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.
I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.
For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.
I had thought about building a layout in our garden alongside our mooring at the
This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.
Please feel free to leave comments, I am always interested in suggestions or questions.
The boat crew and accessories ready for painting.
Yesterday Jo pointed out to me that I hadn’t put the blue surround around the edges of the slides, now rectified.
Keith.
This morning I went to Leamington and bought this model of an air ambulance which now flies over Hadarford.
I finished fitting the last section of reeds, then trimmed them all to a more suitable height, but I may trim them more after I have put the water effect in the canal.
I have also added the roses & castles to the cabin doors on both working boats.
Also a heart on the motor’s slide and a red club on the butty’s slide.
Keith.
I have started to create a reed bank on the canal, I have 2 colours of reed to choose from.
First I drill a 2mm hole in the bank.
Then I put some glue on the end of each reed.
Then each reed is pushed into the hole. Each hole take about 10 reeds.
Hard at it.
Just the start, I will trim them to size once the glue has set.
Good progress after lunch, finished the 1st two section of reeds.
Started the largest section of reeds.
Regards Keith.
Having had a few practice runs on test samples, today I set about creating the grassy canal banks using static grass.
Keith.
The various stages of coach lining the motor boat cabin sides.
1st the large panel.
Then the 2nd largest panel.
Then the engine hole doors.
Finally the smallest panel.
Both boats now have the coach lines.
I also fitted the fire hoses to both cratches.
Keith.
Yesterday I started to put the strings on the side-sheets on the butty.
this was the 1st one.
Unfortunately once I had finished the butty I noticed that they were too close to each other and consequently too many of them as in this photo.
This morning I completed both boats, and that included redoing the butty to space them correctly this time.
This is the pair with the sheeting and strings all completed.
Keith.
I spent 4 hours sifting coal dust to get this pot full for the holds of the 2 working boats, the £1 coin is to give size proportion.
I then loaded the coal into both holds and glued it in place.
Keith.
It wasn’t easy, but I made and fitted the side-sheets for the working boats.
I will now fix the coal in the holds before fitting the strings to hold the side-sheets up.
Keith.
Blue cants to both bows.
Blue cants, stern deck, cabin sides and rear bulkhead on the motor.
Same for the butty.
Stem posts.
Red cabin sides to both boats.
red and blue bands on the swans neck, blue pigeon box and engine hole slides, brass runners for the cabin slide to slide on and red hand rails.
Elam of the butty finished and brass runners for the cabin slide to slide on. The red hand rails need further work on them.
Keith.