From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.

Please feel free to leave comments, I am always interested in suggestions or questions.

Sunday, 11 November 2018

Working Boats Crew and Accessories

The boat crew and accessories ready for painting.

IMG_0673

Yesterday Jo pointed out to me that I hadn’t put the blue surround around the edges of the slides, now rectified.

IMG_0678

Keith.

We Will Remember Them

IMG_0672

Keith.

Saturday, 10 November 2018

Completed Reed Bank, Roses & Castles, Air Ambulance

This morning I went to Leamington and bought this model of an air ambulance which now flies over Hadarford.

IMG_0665

I finished fitting the last section of reeds, then trimmed them all to a more suitable height, but I may trim them more after I have put the water effect in the canal.

IMG_0671

IMG_0670

IMG_0669

I have also added the roses & castles to the cabin doors on both working boats.

IMG_0666

Also a heart on the motor’s slide and a red club on the butty’s slide.

IMG_0667

Keith.


Friday, 9 November 2018

Creating a Reed Bank

I have started to create a reed bank on the canal, I have 2 colours of reed to choose from.

IMG_0654IMG_0651

IMG_0656

First I drill a 2mm hole in the bank.

IMG_0647

Then I put some glue on the end of each reed.

IMG_0652

Then each reed is pushed into the hole. Each hole take about 10 reeds.

IMG_0650

Hard at it.

IMG_0659

Just the start, I will trim them to size once the glue has set.

IMG_0655

Good progress after lunch, finished the 1st two section of reeds.

IMG_0660

Started the largest section of reeds.

IMG_0661

IMG_0662

Regards Keith.

Thursday, 8 November 2018

Bulrushes

I have planted some bulrushes in the canal bank on the towpath side.

IMG_0644

IMG_0645

Keith.

Wednesday, 7 November 2018

First Attempt at Static Grass

Having had a few practice runs on test samples, today I set about creating the grassy canal banks using static grass.

IMG_0642

IMG_0643

Keith.

Tuesday, 6 November 2018

Coach Lining on the Motor

The various stages of coach lining the motor boat cabin sides.

1st the large panel.

IMG_0636

Then the 2nd largest panel.

IMG_0637

Then the engine hole doors.

IMG_0638

Finally the smallest panel.

IMG_0639

Both boats now have the coach lines.

IMG_0641

I also fitted the fire hoses to both cratches.

IMG_0635

Keith.

Coach-Lining

1st attempt at coach-lining on the butty.

IMG_0633

Keith.

Side Sheets Strings.

Yesterday I started to put the strings on the side-sheets on the butty.

this was the 1st one.

IMG_0626

Unfortunately once I had finished the butty I noticed that they were too close to each other and consequently too many of them as in this photo.

IMG_0630

This morning I completed both boats, and that included redoing the butty to space them correctly this time.

This is the pair with the sheeting and strings all completed.

IMG_0631

IMG_0632

Keith.

Sunday, 4 November 2018

Loaded Boats

I spent 4 hours sifting coal dust to get this pot full for the holds of the 2 working boats, the £1 coin is to give size proportion.

IMG_0618

I then loaded the coal into both holds and glued it in place.

IMG_0622

IMG_0623

IMG_0624

Keith.

Side Sheets for the Working Boats

It wasn’t easy, but I made and fitted the side-sheets for the working boats.

IMG_0615

IMG_0616

IMG_0617

I will now fix the coal in the holds before fitting the strings to hold the side-sheets up.

Keith.

Friday, 2 November 2018

Canal Lock Ladders

The canal lock now has a pair of ladders.

IMG_0611

IMG_0610

IMG_0612

Keith.

Further Painting of the Working Boats

Blue cants to both bows.

IMG_0590

Blue cants, stern deck, cabin sides and rear bulkhead on the motor.

IMG_0591

Same for the butty.

IMG_0592

Stem posts.

IMG_0604

IMG_0605

Red cabin sides to both boats.

IMG_0603

red and blue bands on the swans neck, blue pigeon box and engine hole slides, brass runners for the cabin slide to slide on and red hand rails.

IMG_0602

Elam of the butty finished and brass runners for the cabin slide to slide on. The red hand rails need further work on them.

IMG_0601

Keith.