As it is raining, time to crack on with the 3rd and final baseboard. All glued together
From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.
I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.
For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.
I had thought about building a layout in our garden alongside our mooring at the
This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.
Please feel free to leave comments, I am always interested in suggestions or questions.
Friday, 14 November 2025
Baseboards Part 5
Thursday, 13 November 2025
Baseboards Part 4
This morning I glued the central support down the middle of the baseboard frame.
T
Then my wife and I went food shopping. Upon return I glued the first part of the baseboard in place
Then I glued the second part of the baseboard in place
I used some handy weights whilst the glue sets. 😊
Keith
Wednesday, 12 November 2025
Baseboards Part 3
First of the 3 baseboard frames made up. The blue and black straps only just fitted around the whole frame, thankfully. I will leave it overnight for the glue to harden completely. One of the two slots in the central joint was missing so I had to saw it out, and also one of the cross pieces I had to cut at both ends and additional slots in the outer pieces as there was these were mistakes in manufacture, but all sorted with a saw, chisel and a file. 😊
Keith
Tuesday, 11 November 2025
Half-Relief Buildings Part 26, Painting
Hopefully the final coat of paint on the doors this morning
Keith
Half-Relief Buildings Part 25, Doors and Signs
Hopefully the final coat of paint on the doors this morning.
Keith
Monday, 10 November 2025
New loco Completed and Door Painting
With it being damp outside not ideal to do spraying of the terrace or sawing the baseboard legs to length, so indoor jobs today. I started by marking the legs to the same length ready for sawing.
I reassembled the new loco and added some clear and red jewels to the lights.
An 'indoor' job of painting 'doors' for the terrace.
Keith
Sunday, 9 November 2025
Half-Relief Buildings Part 24, Gutter and Downpipes
New Livery for the New Loco
Yesterday I gave the bodywork of the new loco a coat of spray primer. I also sprayed a test piece of plastic as the primer I have is acrylic and my top coats are enamel so I wanted to test that the top coat didn't react with the primer before trying it on the loco. I sprayed the test piece with maroon enamel this morning and after a little while there was no reaction so I sprayed the loco. 😊
Keith
Saturday, 8 November 2025
New Loco
This small diesel loco arrived today, I already have one like it, my intention is to repaint this one in a different livery.
Keith
Friday, 7 November 2025
Half-Relief Buildings Part 22, First Floor Floors
This morning I added the first floor wooden floors. This is the last major part of the construction, with just detailing to do, like gutters, down pipes and ridge tiles externally, then some minor detailing the insides. Last time when I constructed the joint cottages and post office for the old Hadarford, I left doing the downpipes until after painting, but I won't this time, I will glue them on before painting. 😊
Thursday, 6 November 2025
Half-Relief Buildings Part 21, Floors, Roofs and Chimneys
This is just one of the pieces of the ground floor floors which this afternoon I cut out strips of the floor to accommodate the doors which will fit inside the walls.
Having done this to all 7 pieces of floor, I then glued all 7 sections to the walls. 😊
Keith
Wednesday, 5 November 2025
Half-Relief Buildings Part 21, Walls
Last night I took the plunge and glued all 7 wall sheets together. 😊 I now just have to be very careful with handling until I have added the internal walls and floors to add rigidity to the terrace. 🤨
This afternoon I glued the inner dividing walls to the back of the terrace. Not an easy task, I used my magnetic corners to roughly hold the main walls vertical 😊
Keith
Tuesday, 4 November 2025
Monday, 3 November 2025
Half-Relief Buildings Part 19, Legs and Roofs
This morning I took the bus into Leamington and bought these from Jewson's, they will be the legs for my new layout.
This afternoon I finished off cutting the roofs, which I started last night, to accept the chimney stacks. 😊
Keith
Sunday, 2 November 2025
Half-Relief Buildings Part 18, Window Sills and Lintels
First 5 window sills fitted this morning, only 30 more to go! Then 24 lintels to follow. 😁
This afternoon all 35 window sills and 24 lintels now fitted.😊
Keith
Saturday, 1 November 2025
Thursday, 30 October 2025
Half-Relief Buildings Part 16, Chimneys Part 4
Good progress today with 5 double chimney stacks built, only 4 more to go. These do need the corners cutting in, I will wait till tomorrow to allow the glue to completely set overnight. 😊
Keith
Wednesday, 29 October 2025
Half-Relief Buildings Part 15, Chimneys Part 3
3 more chimneys completed today.
This completes all 4 smaller ones, with the 9 larger (4 pot) ones still to do. 😊
Keith
Tuesday, 28 October 2025
Half-Relief Buildings Part 14, Chimneys Part 2
Being busy doing other things today I haven't had much time to do modelling, but I have managed to cut out the remaining 12 chimney stacks and scored them ready to cut.
I also cut the corners of the completed chimney stack to continue the stonework around each jointed corner using a scalpel and then emery paper.
The 4th corner does not have matching stonework, so I have worked it as best I can, but as mentioned in an earlier post this corner will be at the rear and not so visible.
Only 12 more to go! 😊
Keith



















































