From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.

Please feel free to leave comments, I am always interested in suggestions or questions.

Sunday, 2 August 2026

The Railway Inn Part 22

 New replacement chimney for the central roof built to replace the oversized one I made before.


I have done some work on 1 of the 3 original sections of roof which is salvageable so it now fits correctly


I did have to cut away some of the roof at the chimney so the overhangs at each end are equal, this did leave a gap the other side of the chimney which I have cut out a piece of roof tile and filled it.


Even this close up the joint is not easy to see and once painted should disappear completely.


I cut out a piece of card and glued it to the plastic section to create a complete dividing wall on the upper floor.


Using clothes pegs and offcuts of plastic sheet to hold the card flat whilst the glue sets

Keith

No comments:

Post a Comment