From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. The last layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

I have now built the layout. This is now a full record of the building of this layout and any new additions along the way.

Please feel free to leave comments, I am always interested in suggestions or questions.

Saturday 17 December 2016

Santa Needs a New Watch!

Santa Arrived early this morning and delivered this batch of goodies for Hadarford.

This is a hay barn for the farm.

SAM_7612

SAM_7613

These are a cart house & combined stable and the milking parlour, also for the farm.

SAM_7615

SAM_7616

This is 1 set of 2 sets of brick walls, and a chicken coup kit and garage kit all of which are also for the farm.

SAM_7611

SAM_7610

These 2 packs are pavement pieces for the village area, and a Royal Mail van and Arriva bus. The van will be outside the post office, the bus will be somewhere on the road.

SAM_7609

SAM_7608

Keith.

No comments:

Post a Comment