A small first, but vital, step towards the building of Hadarford today.
I fitted a back box on the bulkhead in the hold ready to install a mains electricity supply in the hold. Once I have run some cable through and connected it, it will make like easier for work on the construction of Hadarford, which requires electrical supply, like drilling. It will also mean I can have a small fan heater out there to warm it up a bit during the winter. I will also need a mains supply to operate the railway, and it will be handy for vacuuming the floor as well.
Keith.
No comments:
Post a Comment