With the majority of plaster landscaping having dried by this afternoon I was able to complete this section of the base coat of painting.
The canal bridge and earth bank on the towpath side and the towpath.
the lock landing below the lock.
The lock side. Some finer finishing off is required with a finer brush than the ½” brush I used to get the coverage required.
Churchyard, towpath, canal bank and railway embankment.
The 2 hills at the end of the layout.
Full length view of the canal lock and village area.
Keith.
No comments:
Post a Comment