From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. The last layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

I have now built the layout. This is now a full record of the building of this layout and any new additions along the way.

Please feel free to leave comments, I am always interested in suggestions or questions.

Monday 5 October 2020

Footbridge over the Canal

 For some time now I have concerned that is is no direct pedestrian access from Hadarford Wharf to the village. Friday I received in the post a footbridge kit which I am going to kitbash and fit across the face of the canal bridge on the wharf side. Slow steps so I don't overdo it and upset my back again as it almost completely settled down, but I just keen to get back to it.

The canal bridge against which I will be building the footbridge.


After much measuring and calculating I have decided to go for it, the start is to remove this short section of stone wall.


Short section of stone wall removed.


Top section of the bridge sidewall removed.

At least with what I have done so far has proved it will work.

Keith

No comments:

Post a Comment