Yesterday some shiny new chain arrived in the post.
This morning I replaced the temporary rusty length I had used to test the theory on the short lift-bridge.
These 2 photos show how the chain and tensioner takes up the variable gap, due to expansion and contraction of the hull dependant on outside temperature, between the bridge and the layout.
I then fitted the remaining length of new chain and a new tensioner below the long lift-out bridge.
It still needs some adjustment on another day.
Keith
No comments:
Post a Comment