Did I mention that this point rodding might take a while?
Having glued 2 pieces together I have to wait for the glue to set before adding the next piece.
One set of rodding connected to the junction arms.
2nd section of rodding from the junction through to the ground signal.
Close-up of the 2nd section at the junction end.
Droppers attached to the far side rodding.
The far side rodding temporarily in place.
1st section at the other end of the station towards the maintenance yard.
2 assembled expansion compensators, these allow for expansion and contraction of the rodding with the changes of air temperature.
Should keep me busy until the New Year.
Keith
No comments:
Post a Comment