Drilling, gluing and screwing today. I have made the section of road that will go behind the tunnel portal and the ramp up to it, all drilled, glued and screwed together, leaving overnight for the glue to set. All made from spare pieces from the baseboards that I have not used, I think it is called recycling.
 |
| Section of road behind the tunnel portal with legs attached underneath |
 |
| Section of road behind the tunnel portal on its legs |
 |
| The 2 sections of the ramp joined together |
 |
| The single leg attached to the ramp |
 |
| The ramp on its new leg |
 |
| Both pieces in situ where they will be fixed |
Keith
No comments:
Post a Comment