Quite a productive afternoon so far with the Railway Inn.
![]() |
| Upper and lower frontage glued together |
![]() |
| Upper and lower rear wall glued together |
![]() |
| Upper and lower rear side wall glued together |
![]() |
| Upper and lower left side glued together (the gap between the 2 upper pieces is for the chimney) |
![]() |
| Upper and lower left side glued together |
![]() |
| As the upper tiles end without a mitre joint I have cut in ends of tiles |
![]() |
| All glued pieces set aside to set overnight |
![]() |
| I have mitred the edges of the 2 chimneys, which completes all mitring, and started to assemble the parts of the 2 chimneys |
![]() |
| The almost completed central chimney, still needs the chimney cap and pots to be added |
![]() |
| Brickwork of the large chimney finished and attached to the side wall |
![]() |
| From the other side |