Not a good start this morning. One of the points on the layout has failed and I have had to remove it and ordered a replacement.
This afternoon I have been cutting and placing the pavements in the village.
They need fixing in place, but I will leave that for now as I have to cut and fit the road surface to replace the temporary ones.
Outside the bakery and newsagent.
In front of the chemist and in front of and alongside the butchers.
In front of the Post Office, cottages and in front of and alongside the general stores.
Opposite the general stores and behind and alongside the lock keepers cottage.
At the junction of the 2 roads opposite The Boat Inn.
Alongside Jo’s Tea Rooms.
The new road surface across the two bridges. The temporary black road surfaces will be replaced with further red road surface, and once all fixed in place the roads will be painted black.
Keith.