From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.

Please feel free to leave comments, I am always interested in suggestions or questions.

Saturday, 25 August 2018

Yorkstone Paving.

The start of some of the finishing touches. the residents of Hadarford obviously favour Yorkstone paving.

The under building entrance to the Boat Inn.

IMG_0219

The backyard of the hair salon.

IMG_0221

The bus shelter and telephone kiosk area.

IMG_0218

The passageway between the cottages and the general store.

IMG_0229

The under building entrance and backyard of the chemists.

IMG_0224

The entrance to the butchers has some red floor tiles.

IMG_0225

So does Jo’s tea rooms.

IMG_0227

Keith.

Friday, 24 August 2018

Village Pavements

Not a good start this morning. One of the points on the layout has failed and I have had to remove it and ordered a replacement.
This afternoon I have been cutting and placing the pavements in the village.
They need fixing in place, but I will leave that for now as I have to cut and fit the road surface to replace the temporary ones.
Outside the bakery and newsagent.
IMG_0206
In front of the chemist and in front of and alongside the butchers.
IMG_0208
In front of the Post Office, cottages and in front of and alongside the general stores.
Opposite the general stores and behind and alongside the lock keepers cottage.
IMG_0209
At the junction of the 2 roads opposite The Boat Inn.
IMG_0210
Alongside Jo’s Tea Rooms.
IMG_0211
The new road surface across the two bridges. The temporary black road surfaces will be replaced with further red road surface, and once all fixed in place the roads will be painted black.
IMG_0212
Keith.

Baggage Van

Received this baggage van in the post this morning. Another eBay bargain.

IMG_0213

IMG_0214

Keith.

Thursday, 23 August 2018

2 New Purchases

These arrived in the post this morning.

A Baldwin 4-6-0 engine and 2 special edition “Bure Valley Railway” wagons.

IMG_0203

This photo is of the new engine behind the kit one I built for my late father about 30 years ago.

Quite a difference especially in the size of the motor, which in the original one extends into the cab area, whereas the new one you cannot see the motor at all!

IMG_0204

Keith.

Monday, 20 August 2018

Filler and Painting

This morning was spent using filler to fill all the gaps in the landscape.

This afternoon I painted the brickwork of the canal lock and the approach walls.

IMG_0193

The painted brickwork of the canal wharf wall.

IMG_0194

The painted brickwork underneath the canal bridge.

IMG_0195

I also painted the tunnel portal, fixed in in place and filled in the gaps around it.

IMG_0199

IMG_0198

Keith.

Sunday, 19 August 2018

3rd and Final Phase of Landscaping and Further Lock Chamber Construction.

The 3rd and final phase of landscaping is almost complete in the village and canal lock area. I just need to add a small fillet along the front edge adjacent to the railway track, but I need to wait for the glue to set on the rest before doing that. I will also need to do some final shaping once I have added the fillets and they have set.

The whole village and lock area.

IMG_0190

The church area.

IMG_0187

I have also made and fitted the lower lock entrance walls, underneath the bridge.

As seen from the canal wharf.

IMG_0188

The lower lock entrance on the towpath side, as seen from the lock.

IMG_0189

The lower lock entrance on the opposite side to the towpath.

IMG_0191

Keith.

Early Stages of Canal Lock Construction

I have made a start on constructing the canal lock. It will take some time to complete but I am in no hurry.

The lock walls are from Langley Miniatures and are made from resin. The lock gates, paddles, bollards, etc. are also from Langley Miniatures and are white metal.

I haven’t given myself a lot to fix the wall to, but when I start to create the water effect this will hold them in place.

IMG_0177

Keith.

Saturday, 18 August 2018

2nd Phase of Landscaping

2nd phase of landscaping started today. The canal bridge, Hadarford Lodge and The Boat Inn area.

IMG_0169

IMG_0170

Keith.

Friday, 17 August 2018

Landscaping 3

Further progress this afternoon with the landscaping at the farm end of the layout. This now completes this piece of landscaping apart from filling in the gaps, awaiting sculpting plaster to be able to do this.

I also repaired the sinkhole that appeared over the tunnel portal during shaping due to the foam being very thin at that point.

IMG_0161

IMG_0164

IMG_0162

IMG_0165

Keith.

More Landscaping

Before setting food shopping at 9.00am this morning I managed to add some further landscaping either side of the road between the farm and station.

Needs finishing off now I am back home.

IMG_0160

IMG_0159

Keith.

Thursday, 16 August 2018

Tunnel Portal and Road to Farm.

Tunnel portal in place but not yet fixed, the foam landscaping is now fixed in place.

IMG_0155

The wood base for the road down from the farm to the station fixed in place.

IMG_0158

Keith.

First Stage of Landscaping

The beginning of landscaping. This large piece of insulation was the smaller piece of two which were taped to the insulation sheets, for strengthening reasons, we had delivered to insulate the room.

I will be using part of the other piece soon.

This piece needs more work but I ran out of time yesterday, having spent the morning doing some much needed work on the boat, which, due to complications, took longer that it should have.

IMG_0154

IMG_0153

Keith.

Friday, 10 August 2018

Wider Canal Bridge

This morning I took a saw to the two canal bridges to make them into one.

IMG_0105

Wide enough now to have a road over it. I will need to apply a new road surface but that will happen when I fit all the roads.

IMG_0106

The new canal bridge in its location on the layout.

IMG_0107

IMG_0108

Keith.

Thursday, 9 August 2018

Canal Bridge

Back in February last year I purchased on eBay a Hornby canal bridge. Upon receiving it I discovered that it is very narrow and the road is only wide enough for one vehicle. Definitely meant to be a farmers access bridge and not suitable for the road from the station to the village. Ever since then I have been pondering over how widen it. A few days ago I came up with the solution, to purchase a 2nd bridge, and to cut them lengthwise then join them together to form one wider bridge.

I purchased a 2nd bridge on eBay which arrived today.

IMG_0103

The two bridges side-by-side awaiting the saw!

IMG_0104

Keith.

Wednesday, 8 August 2018

Level Crossing

Spent quite a bit of time today modifying the Dapol level crossing kit to fit the 009 track.

The difficulty was to get the crossing lower than the rail top, but I managed to do it after much sawing and filing.

IMG_0101

IMG_0102

Keith.

Tuesday, 7 August 2018

Planning the Final Positions of the Buildings Before Landscaping Can Start.

Today, whilst awaiting the wire I need to finish wiring the layout, I had a good tidy and clean up.

This then enabled me to position the buildings on the layout to get their locations sorted ready to start creating the landscape.

The farm over the tunnel and the engine shed and maintenance area.

IMG_0100

The station area and lock-side cottages.

IMG_0098

The canal Wharf, Hadarford Lodge, and The Boat Inn.

IMG_0096

The canal lock, lock keepers cottage and stores, village shops, village hall, vicarage and church.

IMG_0093

Lengthways views.

IMG_0099

IMG_0097

IMG_0095

Keith.