The 3rd and final phase of landscaping is almost complete in the village and canal lock area. I just need to add a small fillet along the front edge adjacent to the railway track, but I need to wait for the glue to set on the rest before doing that. I will also need to do some final shaping once I have added the fillets and they have set.
The whole village and lock area.
The church area.
I have also made and fitted the lower lock entrance walls, underneath the bridge.
As seen from the canal wharf.
The lower lock entrance on the towpath side, as seen from the lock.
The lower lock entrance on the opposite side to the towpath.
Keith.