Today I decided to add an extra chimney at the rear of the hotel, which will be for the kitchen.
At the same time I constructed the central chimney, then I added to the roof, which I completed today. I then added the barge boards and most of the guttering (see further down for explanation).
The completed roof fitted temporarily to the building. I am leaving it loose for the time being so I can install the led lighting when it arrives next week.
I haven’t added the piece of guttering on the rear wall as this will have to be done once the roof is fixed on to the walls. This piece of guttering will have to cross the small chimney, which will make the roof unable to be removed once this has been added.
Keith.