Having returned to our mooring for the winter, and finished sorting out a few things, I set about painting the coping stones on the lock walls and the upper lock landing today. I also touched up the concrete treadways under the lock beams and the earth up to the lock wall coping stones.
For some time I have been mulling over the earth bank between the canal bridge and the lower lock landing on the towpath-side. I was not happy with such a bank being there, so I have been considering different schemes to replace it. I have decided to replace it with simulated concrete piling with bullhead rail running along its length, typical on the Grand Union Canal. I have ordered a length of bullhead track, which should arrive Monday. I have removed the earth bank in preparation for constructing the piling. It didn’t take too much to remove it, so probably a good thing I am changing it.
Keith.
No comments:
Post a Comment