This morning I cut some cardboard up into 3mm x 17mm pieces for the concrete piling.
Piles of concrete piling on the towpath ready for fitting.
After lunch I glued the pieces of piling onto the towpath edge and repainted the canal bed and towpath around it.
I have started to convert this kit of a small (10ft x 7ft) signal box into a model railway shed.
Keith.
No comments:
Post a Comment