Not a lot achieved today on the central baseboard, I have used the last of the red wire and awaiting more in the post, but I did wire up 2 of the switches which isolate sections of track.
![]() |
| Nearly all the red wiring completed |
![]() |
| The isolating switch for the siding wired in |
![]() |
| The isolating switch wired in which switches power between the station track and the passing loop |
Poor natural light stopped play again.
Keith



No comments:
Post a Comment