From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. The last layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.

Please feel free to leave comments, I am always interested in suggestions or questions.

Friday, 16 January 2026

Track Wiring Part 6

 This morning I had a rethink and decided to move the 5 boxes associated with the Smartswitch to give easier access for wiring up. The first 3 photos are the original positions.

Original position of the main Smartswitch box on the central baseboard

Original position of the 2 Smartfrogs on the central baseboard

Original position of the other 2 Smartfrogs on the right-hand baseboard

Main Smartswitch box and 2 Smartfrog boxes on the central baseboard repositioned as well as the connecting block for the power lead

2 Smartfrog boxes on the right-hand baseboard repositioned

This afternoon I completed the track wiring on the 3rd and final baseboard, all ready for soldering tomorrow.

One quarter of the baseboard marked up with identifying colours ready for wiring

3rd and final baseboard track wiring completed ready for soldering

This is all that is left of the 10 metres of wire I purchased for the job

Keith

No comments:

Post a Comment