Not much progress today, due to having to take the radiator out of our shower room so it can be painted, and a trip to our local hardware shop for some plaster to use on the layout.
After lunch I started to tackle the detail around the lock.
I have decided to create concrete balance beam tread areas, which will have bricks added for the foot grips, along with the ground paddles at the top gates.
Bottom gates tread areas.
I have also started to create the towpath ramp from under the bridge up to the lock-side.
Keith.