Shopping this morning meant a delayed start today. I have though primered with red oxide the canal lock approach walls and the lock landing.
I have fixed the towpath under the bridge and the towpath ramp, and primered both and the remaining retaining walls around both bridges.
The other end of the towpath under the bridge.
I have prepared the lock beam tread areas for attaching the raised bricks which I have cut ready.
Finally I have prepared the last pieces of landscaping, I will glue them down tomorrow.
Keith.
No comments:
Post a Comment