This afternoon I added the white lines either side of the pedestrian crossing.
I then fixed the level crossing ramps and the pedestrian crossing gateways in place.
I have temporarily removed the other parts of the crossings in preparation for ballasting the track, which I will have to do before I can finally fix the remaining parts of both crossings in place.
Keith.
No comments:
Post a Comment