From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. The last layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

I have now built the layout. This is now a full record of the building of this layout and any new additions along the way.

Please feel free to leave comments, I am always interested in suggestions or questions.

Thursday 22 November 2018

Level Crossing Servos and Control Board

Having prepared the level crossing components, I wanted to fit the servos to motorize the gates.

Unfortunately I discovered that one of the servos was where the cross beam under the joint of the 2 baseboards was.

Fortunately this beam is 50mm wide, to support the joint, so there was room to remove some of it to be able to fit the servo, as in this photo.

IMG_0723

Both servos and the control board fitted.

IMG_0724

The steel activation rods which will be glued into the servo drives are temporarily in place.

IMG_0725

The gates will be glued to these rods once the control board is wired up and functioning and I can determine the correct location on the rods to fit the gates.

Keith.


No comments:

Post a Comment