Yesterday and today Jo and I have fitted guttering down both sides of the railway room.
It is to prevent any rain leakage past the sheeting should the sealant fail, and also to catch any condensation from under the gunnels, so that neither drip onto the layout.
Keith.
No comments:
Post a Comment