From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.

Please feel free to leave comments, I am always interested in suggestions or questions.

Thursday, 6 September 2018

Base Coat Painting

With the majority of plaster landscaping having dried by this afternoon I was able to complete this section of the base coat of painting.

The canal bridge and earth bank on the towpath side and the towpath.

IMG_0307

the lock landing below the lock.

IMG_0308

The lock side. Some finer finishing off is required with a finer brush than the ½” brush I used to get the coverage required.

IMG_0312

Churchyard, towpath, canal bank and railway embankment.

IMG_0309

The 2 hills at the end of the layout.

IMG_0310

Full length view of the canal lock and village area.

IMG_0311

Keith.

Wednesday, 5 September 2018

Plan B

Unfortunately I discovered yesterday that the papier mâché did not work. In places it was not sticking down. When I lifted it where it was lifting, it came off in sheets and had not stuck to any of the landscaping.

So this morning I have used plaster instead where needed.

IMG_0301

IMG_0300

IMG_0299

IMG_0298

Keith.

Sunday, 2 September 2018

Lock Keepers Cottage Steps.

2 stone door steps at the door of the lock keepers cottage.

IMG_0295

Keith.

Papier Mâché

A messy morning covering the foam insulation landscape with papier mâché.

IMG_0284

IMG_0283

IMG_0288

IMG_0294

IMG_0285

IMG_0290

IMG_0289

IMG_0291

IMG_0293

Quite an appropriate use for Towpath Talk.

IMG_0287

Keith.

Saturday, 1 September 2018

Final Plastering.

This afternoon I used some moulding plaster to create the earth bank of the canal.

IMG_0282

With what was remaining from the mix I have attached a large boulder above the tunnel.

IMG_0281

I have to wait 24 hours for it all to dry before I can clean it all up, so a bit of time off.

Keith.

Foundations and Lock Area

This morning I fixed the foundations of Jo’s Tea Room, the lock cottage and stores in place.

IMG_0278

After lunch and when the glue on the foundations had set, I did the final plaster work around the lock.

IMG_0279

Also the plastering along the top edge of the lock landing.

IMG_0280

Keith.

Friday, 31 August 2018

Last Major Landscaping

Having shaped the churchyard, this now completes all the landscaping of the insulation foam.

IMG_0277

Keith.

Lower Lock Landing, etc.

Today I constructed the lower lock landing, Hadar awaiting the lock on the lock landing.

IMG_0275

I laid the Yorkstone patio for Jo’s Tea Rooms.

IMG_0276

I have now fixed in place the 4 treadways under the lock gate balance beams and started to fill in around them, but I need to let this dry before doing some more.

IMG_0274

I have painted the landscaping at the farm, farm road and tunnel area.

IMG_0271

I also painted the the the 2 new pieces of landscape at the other end of the layout.

IMG_0272

Keith.

Thursday, 30 August 2018

Lock Beam Tread Bricks & Canal Bed.

Today I glued the bricks to the simulated concrete for the treadway under the balance beams for the lock gates.

IMG_0268

Then I used plaster to form the canal bed above the lock.

IMG_0270

Keith.

Wednesday, 29 August 2018

Primering and Final Landscaping.

Shopping this morning meant a delayed start today. I have though primered with red oxide the canal lock approach walls and the lock landing.

IMG_0259

I have fixed the towpath under the bridge and the towpath ramp, and primered both and the remaining retaining walls around both bridges.

IMG_0260

The other end of the towpath under the bridge.

IMG_0261

I have prepared the lock beam tread areas for attaching the raised bricks which I have cut ready.

IMG_0265

Finally I have prepared the last pieces of landscaping, I will glue them down tomorrow.

IMG_0266

IMG_0267

Keith.

Tuesday, 28 August 2018

Towpath Ramp.

Towpath ramp and back wall constructed, but not fixed in place. The ramp has the raised bricks for the horses hooves to grip.

IMG_0257

Keith.

Canal Lock Details

Not much progress today, due to having to take the radiator out of our shower room so it can be painted, and a trip to our local hardware shop for some plaster to use on the layout.

After lunch I started to tackle the detail around the lock.

I have decided to create concrete balance beam tread areas, which will have bricks added for the foot grips, along with the ground paddles at the top gates.

IMG_0252

Bottom gates tread areas.

IMG_0253

I have also started to create the towpath ramp from under the bridge up to the lock-side.

IMG_0254

Keith.

Monday, 27 August 2018

Lock Landing

this morning I had fully intended to be a “navvie” to dig out the canal above the lock. However, I suddenly realised that I had not constructed the lock landing area above the lock!

For those who do not know about canals, a lock landing is a section of some form of wall where boats can tie up temporarily to be able to leave it there and to go to the lock to prepare it to go into it.

This is the now constructed lock landing.

IMG_0246

Hadar patiently waiting on the lock landing for the 2 working boats to exit the lock.

IMG_0248

Keith.

Sunday, 26 August 2018

Village Roads and Car Parks.

All the village roads and car park areas are now cut to shape ready to be glued down.

IMG_0236

The village hall and church car park area.

IMG_0237

Village shops roads.

IMG_0238

Post Office, general stores etc. area.

IMG_0239

The Boat Inn car park.

IMG_0240

Keith.

Saturday, 25 August 2018

Upper Lock Entrance

This afternoon I constructed the upper lock entrance.

IMG_0230

Keith.