From when my Parents gave me my first train set for a Christmas present as a child, I have had an interest in model railways. I originally started in "OO" gauge, but have also built in "N" and "O" gauge. One layout I built was my exhibition layout "Holmehurst" which was in "O" gauge, and I exhibited it around the country. Photos of it can be seen by following this link.

I inherited some "OO9" rolling stock from my late father, including a loco I built from a white metal kit for him, and ever since living on our working narrowboat Hadar I have been thinking about building a "OO9" layout.

For those who do not know, "OO9" is "OO" scale, which is 4mm to 1ft, but the track and rolling stock are narrow gauge, equivalent to 2ft gauge in real life. Modelling-wise this means that I can used standard "OO" scale buildings, people, scenery etc. of which there is a far greater range of ready built items and kits to choose from, but it has the advantage that the reduced size of the track and rolling stock means that curves can be tighter than for standard gauge, without losing a realistic look within a restricted layout size.

I had thought about building a layout in our garden alongside our mooring at the Saltisford Canal Centre, but after much thought decided that this would not be practical. However I built a small layout (now dismantled) which sat on the shelf above the display cabinet, in our saloon, which houses my "O" gauge rolling stock. Having finished it, my wife Jo suggested that when we stop selling coal I could build a layout in the hold. As we stopped selling coal at the end of 2016.

This is a full record of the building of the original layout, and having moved into a flat in Warwick and sold our narrowboat, this will now cover the building of the New Hadarford in our flat.

Please feel free to leave comments, I am always interested in suggestions or questions.

Friday, 7 August 2026

The Railway Inn Part 27

 It's a 'sign' of the times, I created 4 signs and attached them to the Inn.

Paper signs cut out ready

2 parts of the hanging sign glued together

One sign glued to one side

The other sign glued to the other side

The 3 name signs glued to a piece of plastic sheet

First 2 border sides to the larger sign glued to the plastic sheet

Remaining 4 side borders to the smaller signs glued to the plastic sheet

The top and bottom borders glued to the plastic sheet

Borders trimmed and the 3 name signs cut from the plastic sheet and the hanging sign

The large name sign glued to the front of the Inn

One small name sign glued to one side of the Inn

The other small name sign glued to the other side of the Inn

The hanging sign glued to the front of the Inn

Downpipes, waste pipes and waste pipe hopper sprayed with primer

The downpipes painted with gloss black and ready for fitting, I have left the hopper attached to the blacktac so I don't lose it

Keith

No comments:

Post a Comment