Today I set about install the point rodding at the 2nd pair of points, at least this time I have remembered to do it before ballasting the track! 😁
![]() |
| Point rodding installed |
![]() |
| Painted with primer |
![]() |
| Rodding painted with gunmetal metallic paint |
![]() |
| Close-up at the signal box, ducting under the track painted to look like clay piping |
![]() |
| Duct on other side of the track |
![]() |
| The other point |






No comments:
Post a Comment