This morning, I applied glue down between the 2 tracks through the station and under the point rodding of the right-hand point at the front of the layout, then sprinkled ballast on it. I have not taken it all the way along the front of the layout as I am going to put static grass down there at the same time when I do the static grass on the 3rd baseboard.
![]() |
| Ballast underneath the point rodding |
![]() |
| Ballast glued down between the 2 tracks at the station |
![]() |
| Then I painted the road surface asphalt colour. |
![]() |
| Piece of board cut for the section of pavement continuing from the centre baseboard and the half-relief buildings at the rear of the layout |
![]() |
| Final piece of board cut for the section of pavement continuing from the centre baseboard for the 2 thatched cottages |
![]() |
| Superquick pavement papers cut and glued to the 2 pieces of board |
![]() |
| Buildings temporarily in place to check alignment |
![]() |
| View down the road |
![]() |
| Final pavements glued down with Evo-Stik and handy weights used to keep it all flat |
Keith









No comments:
Post a Comment